Sunday, February 14, 2010
More Work Done this Weekend
I added another 30 tap on Saturday, I was short 6 tees and about 100 feet of tubing to finish the job. I only have a few stragglers that need to be after this set. Mostly trees I plan on culling next year. I might just use my old 7/16 taps on those. Sunday I built a sap tower to hold the 55 gallon head tank and spent the rest of the time figuring out how to plum it. More pluming supplies needed. I took Monday off to get caught up on things. I started working on the tractor to convert it over to 12 volts to run the sap pump. I spent more time on the road getting parts than I did rewiring everything. The tractor has a new 12 volt 60amp alternator to run the sap pump and 3 55 watt driving lights. You know, the lights are need to track down my wild maple trees at night, they are tough to spot compared to the domesticated maples that most people tap... It all works with the exception of missing one relay for the lights. I also stop by my welder to have him touch up some pin hole that I could not get with my mig welder (the same work I paid him fix a few weeks ago and I got them back with the same pin holes), and he blew me off, told me he was out of ss rod and take the pans somewhere else. The owner is on vacation this week so, I'm not sure what is going on, but I did take the pans to another machine shop (C&C).
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment